News
AI Summary
31 Aug 202619 Rabiʻ I 1448 AH
HUMAIN, DataVolt break ground on NEOM AI facility

HUMAIN, DataVolt break ground on NEOM AI facility

HUMAIN, owned by the Public Investment Fund, and DataVolt have commenced construction on a 100MW facility in Oxagon. This facility is part of a larger 360MW computing campus, with operations expected to start by 2028. The project aims to deliver high-density computing infrastructure for complex AI workloads, relying on renewable energy and advanced cooling systems. It also benefits from subsea data cables connecting the Red Sea to Europe and Africa.

Follow these topics

Sign in to follow the topics that matter to you

Sign in to follow

This summary is generated with AI and receives periodic editorial review. Refer to the original source for full details.

0
0 reading now

Insight Score

Rate to unlock

Sign in to react, rate, and save. Sign In